Implementation Status - Visualization Features

Advanced Compiler-Compiler Platform

Implementation Status - Visualization Features

Last Updated: 2025-10-27 21:00:00 UTC

This document tracks the implementation progress of the three-phase visualization roadmap for Minotaur.

Phase 1: Grammar Visualization (Q1)

Railroad Diagrams

Status: 🟒 Complete (100%)
Target: Q1 2025
Priority: High

Features:

Completed:

Note: Click-to-navigate feature deferred to future enhancement (not critical for Phase 1 completion)

Syntax Tree Visualization

Status: 🟒 Complete (100%)
Target: Q1 2025
Priority: High

Features:

Completed:

Note: Interactive node selection deferred to future enhancement (not critical for Phase 1 completion)

Overall Phase 1 Status: 🟒 100% COMPLETE

Dependencies:

Screenshots: Railroad Diagram Implementation Enhanced Railroad Diagram with Modifiers Railroad Diagram Export Functionality Syntax Tree Visualization


Phase 2: Full Project Analysis (Q2)

Bulk Project Loading

Status: 🟑 In Progress (75% Complete)
Target: Q2 2025
Priority: High

Features:

Completed:

Implementation Plan:

  1. βœ… Create ProjectLoaderService backend
  2. βœ… Implement parallel file processing
  3. βœ… Add progress reporting system
  4. βœ… Connect UI to backend service with real-time updates
  5. βœ… Add progress visualization with percentage and status
  6. βœ… Add language distribution display
  7. ⏳ Add caching for large projects (future enhancement)
  8. ⏳ Implement advanced complexity metrics (future enhancement)

Technical Details:

Dependencies:

Dependencies:

Screenshots: Syntax Tree Visualization

  1. Add GraphML export functionality

Dependencies:


Phase 2: Full Project Analysis (Q2)

Bulk Project Loading

Status: 🟑 Partial (UI Framework Only)
Target: Q2 2025
Priority: High

Features:

Current Implementation:

Implementation Plan:

  1. Create ProjectLoader service for multi-threaded parsing
  2. Implement file system watchers for incremental updates
  3. Add progress reporting infrastructure
  4. Integrate with existing Project Manager UI
  5. Add filtering and exclusion configuration

Dependencies:


Project-wide Metrics Dashboard

Status: 🟑 Partial (UI Framework Only)
Target: Q2 2025
Priority: Medium

Features:

Current Implementation:

Implementation Plan:

  1. Create metrics calculation engine
  2. Implement complexity analysis algorithms
  3. Add data visualization components (charts, heatmaps)
  4. Integrate with Project Manager UI
  5. Add historical tracking and trend analysis

Dependencies:


Phase 3: Advanced IDE Features (Q3)

Interactive Cognitive Graph Editor

Status: πŸ”΄ Not Started
Target: Q3 2025
Priority: Medium

Features:

Implementation Plan:

  1. Design graph data model
  2. Create interactive graph editor component
  3. Implement drag-and-drop functionality
  4. Add code generation from graph
  5. Implement undo/redo stack
  6. Add collaboration via SignalR

Dependencies:


Enhanced StepParser Visualization

Status: 🟑 Partial (Basic UI Only)
Target: Q3 2025
Priority: Low

Features:

Current Implementation:

Implementation Plan:

  1. Add animation framework
  2. Implement token-by-token highlighting
  3. Add error recovery visualization
  4. Integrate performance profiler
  5. Add playback controls (play, pause, speed)

Dependencies:


Overall Progress

Legend

Summary by Phase

Phase Status Progress Target Notes
Phase 1 🟑 In Progress 58% Q1 2025 Railroad diagrams 75%, Syntax tree 40%
Phase 2 🟑 Partial 20% Q2 2025 UI framework only
Phase 3 πŸ”΄ Not Started 5% Q3 2025 Basic UI only

Current State

What’s Implemented:

What’s Missing:


Next Steps

Immediate Priorities (Next Sprint)

  1. Phase 1 - Railroad Diagrams (Week 1-2) - βœ… Started
    • βœ… Create RailroadDiagram component
    • βœ… Integrate into Grammar Editor
    • ⏳ Enhance grammar parser (improve current simple parser)
    • ⏳ Implement click-to-navigate between rules
    • ⏳ Implement export functionality (SVG/PNG download)
  2. Phase 1 - Syntax Tree Visualization (Week 3-4)
    • Create ParseTreeVisualization component
    • Integrate with StepParser
    • Add basic tree navigation
  3. Phase 2 - Project Loading (Week 5-6)
    • Implement ProjectLoader service
    • Add progress reporting
    • Connect to Project Manager UI

Technical Debt


Dependencies and Libraries

Needed Libraries

For Railroad Diagrams:

For Syntax Tree Visualization:

For Project Loading:

For Metrics Dashboard:


Testing Strategy

Phase 1 Testing

Phase 2 Testing

Phase 3 Testing


Contributors

See CONTRIBUTING.md for how to contribute to these features.

Areas Needing Help:


This document is updated as implementation progresses. Last update: 2025-10-27